Showing posts with label self-build. Show all posts
Showing posts with label self-build. Show all posts

Saturday, March 5, 2011

House Progress - Second Floor Walls Up!

With all the lovely weather we've been having we have had a tough time, or rather hubs has had a hard time, working on the house so it's taking forever....maybe it really is supposed to take this long anyway and I should relax a little.  When I go out to the build site and see nothing, in my mind, more done than the last time I was out but hubs has been out there "working" on the house all day until midnight, I get a little testy.  The wind has not allowed for much as far as standing walls go, especially on the upper floor, God forbid a wind gust would come along and swoop up a wall throwing it far into the farmers field....and yes, that would be our luck! 

We have had one of the coldest and snow filled winteres that I can remember in a long time with stretches of temps in the -20's- to -30's and the windchill warnings to follow of -38 or colder....brrrrrr is all I can say!  The groundhog  should be shot!  So much for him being a sign of winter coming to an end and an early spring; last I heard we are supposed to have colder than normal temperatures for the next 3 months, well into spring.  Again, this would be our luck.  If you think I'm joking or being dramatic, I'm not.  It never fails, whenever we have to do something big like move from one Province to another, build a house, book a holiday or whatever, it seems that the weather is always bad.  When we were packing the uHaul truck, temperatures were, no word of a lie, in the -30's and -50's with the windchill. Anyone who says that the windchill doesn't make the temperature colder should try standing outside dressed like an Eskimo for five minutes.


Our 2nd floor walls are up! Look how tiny hubs looks.  ;-)

Tuesday, February 1, 2011

House Framing - Progress



The progress of our house build has been a slow one.  We have had so many delays and to top it all off this winter has offered terrible conditions for building causing even more delays.  Pictured here is the walkout basement ICF foundation with the walkout part framed in and main floor joists on. 

As you can see there is a mountain of snow which incidentally had already been snow blown out on more than one occasion.  This makes it very difficult for my husband to build our house in a timely manner.  I am soooo ready for this winter to be over!


I'm pictured all in black above, my husband is bent over nailing the floor on and if you can see our eldest daughter climbing up just below him, she's blending in a little.  The picture isn't the best; it was snowing and somewhat of a blizzard....brrrr.

Here is our house to date, the main floor is nearly framed in completely with the only wall left to build being the back wall of the house which is mainly windows, similar to the basement walkout frame.  The bottom foot of the walls will be boarded as well, this was left so that the walls were easier to stand.  The walls were built on the floor and raised into position after. 

The rest of the main floor and the 2nd floor joists placement should be finished by next week, weather permiting.  I will be sure to post our progress as we go.  Cross your fingers for us that we will have decent weather, mainly with little to no wind, for the rest of our build.  These -20 degrees celcius temperatures with the windchill bringing it to -34 or worse is crazy; I have no idea how my husband can stand it.  I was out there in those temperatures to get an idea of room locations and size for no more than 5 minutes and my forhead was nearly froze through; I tried to kiss my husband and couldn't feel my lips.  I pray he can get the rest of the house framed in quickly so that he at least has some protection from the elements and has a place he can put a heater to get warm.
Related Posts Plugin for WordPress, Blogger...